VANDERBILT STADIUM SOUTH ENDZONE, TN

We at Group Steel Erectors were responsible for assembling and installing the structural steel framework for the Vanderbilt Stadium South Endzone in Tennessee. Through precise coordination, heavy lifting, and strict adherence to safety protocols, we ensured the project was completed on time and met all specifications, maintaining the stability and integrity of the construction.

Our expertise in handling complex steel structures contributed significantly to the enhancement of the stadium’s infrastructure.

Challenge in project

Group Steel Erectors faced significant challenges at Vanderbilt Stadium’s south end zone, including working within an active sports facility and adhering to a tight schedule. The complex design required precise steel fabrication and installation. Weather conditions further complicated the project, demanding flexible contingency plans. Despite these obstacles, the project was completed successfully.

Description

Project
Description

Size : 80,000 square feet
Location : Nashville, Tennessee
Project start : March 2021
Project finish : September 2022
Value : $15m.

the result

Final Result

Group Steel Erectors overcame significant challenges, including working within an active facility, complex design requirements, and variable weather conditions, to deliver a successful project.

With our proven success at Vanderbilt Stadium, we deliver top-quality steel erection, on time and safely. Let us bring precision and excellence to your next project. Contact us today!

Let’s Get in Touch

Contact details

Phone: (615) 441-4934
E-mail: info@groupsteel.net
Address: PO BOX 61 Dickson, TN 37056

Opening hours:
Monday — Friday 7:00 – 6:00